The BIG Garage 
I started to build my first garage for my then 2 Cadillacs in 2005. Unfortunately the town did not allow me to build it as big as I planned to. So I had to settle for a smaller garage. Its now the home for 3  Cadillacs. As my collection still grew I needed more space, so I decided to build another bigger garage 3 minutes from my home. I started building in September 2012 and the construction work is still going on.
It was planned by a fellow Cadillac aficionado - thanks Clemens for your support and great help! Once finished it can hold up to 8 full-size cars. Unfortunately I can't afford to buy another car for a couple of years now...
There is still some space to rent inside the garage - let me know if you are interested!
 a 360º view of the property before the construction began..
 trees are cut down - work started on September 13th 2012
 lot of junk appeared under the bushes...
 we dug out this old helmet
 September 21st 2012
 my friend Richard helping out
 my friend Mike helping as well
 September 24th - the walls are filled with concrete
 September 25th. The roof was installed
 filling out the gaps on the roof
 filling the gaps
 it will now get insulated and waterproofed
 sealing the floor
 October 5th
 the new driveway
 insulation for the roof
 power lines
 October 11th - insulated and sealed roof
 October 12th - the floor
 gravel on the roof
 electric stuff
 October 19th - doors and windows
 my friend Richard installed the windows
 lots of people at work
 lots of people at work
 my friend Richard installed the windows
 my friend Richard installed the windows
 the doors in place
 insulating the windows
 October 20th - test fitting the 58
 test fitting the 58
 the 58 in front of the new garage
 the doors in place. The rest of the garage will be painted in the same color scheme.
 work on the roof
 work on the roof
 entrance door installed
 little Elliot is having fun as well
 my wife at landscaping
 Elliots indoor fun house
 Elliots indoor fun house
 very humid inside after the temperatures dropped
 very humid inside after the temperatures dropped
 finishing touches on the roof in the snow
 finishing touches on the roof in the snow
 finishing touches on the roof in the snow
 finishing touches on the roof in the snow
 finishing touches on the roof in the snow
 after a week the dehumidifiers brought humidity down to 67%. We started with 95%...
 the Roadmaster will spend the winter there
 the Roadmaster will spend the winter there
 preparations for paint
 almost ready for paint
 should I paint it like this? I made a quick photoshop picture to get an idea
 should I paint it like this? I made a quick photoshop picture to get an idea
 My friend Mike suggested this - I like it!
 the other option...
 the new junction box
 the new junction box
 lots of work to do on the inside
 ready for paint
 light above the door
 elastic grout
 Humidity came down
 the first lights are working. The Cadillac neon is waiting to be installed
 The electrician at work
 exterior lights and the first snow...
 will paint the exterior next spring
 some more color ideas
 some more color ideas
 some more color ideas
 My friend Richard helping out once again!
 My friend Richard helping out once again!
 My friend Richard helping out once again!
 My friend Richard helping out once again!
 January 2013 - my friend Tayfun helping out
 my friend Tayfun helping out - preparing for paint
 2013 - my wife Afra helped my planting a Thuja hedge
 It was planned to coat the floor...
 sanding the screed for the epoxy coating...
 as it turned out - there is a huge problem with the new floor. Its way too soft!
 as it turned out - there is a huge problem with the new floor. Its way too soft! Looks like it will have to come out completely again!
 Plastering work on the outside
 May 18th 2013 - My friend Richard Vobr once again helped me out! Here he is doing some plastering work around the garage doors
 My friend Richard Vobr once again helped me out! Here he is doing some plastering work around the garage doors
 My friend Richard Vobr once again helped me out! Here he is doing some plastering work around the garage doors
 some emergency roof repair work on the building next to the garage. It will of course be fixed correctly eventually later...
 some emergency roof repair work on the building next to the garage. It will of course be fixed correctly eventually later...
 plastering work around the door
 before plastering
 before plastering - one can still see the insulation in the wall.
 Lots of junk to dispose
 The "old" floor has to come out!
 Thats me on a digger ;-)
 tools for floor removal
 the last picture of the "old" floor
 one of the weak spots in the wooden building on the side of the garage.
 out comes the floor
 fully removed screed - now they have to reseal the concrete baseplate again.
 The baseplate got another sealing
 new cement was delivered
 June 28th 2013 - the new screed is coming in
 the new screed
 the new floor is finished!
 sealing
 sealing
 preparations for the paint
 my friend Richard helped
 my friend Richard helped
 sealing the floor
 sealing the floor
 sealing the floor
 my wife helped me masking off the interior
 everything masked off
 everything masked off
 everything masked off
 dressed for spray painting
 the first coat of white
 white ceiling
 making the markings for the stripes
 markings
 starting to mask for the stripes
 masking
 masking
 masking
 masking
 painting the red stripes
 red and grey stripes
 carefully peeling of the masking tape
 peeling off
 looking good
 August 31st 2013 - the cars are moving in
 the cars are moving in
 the cars are moving in
 the cars are moving in
 the cars are moving in
 the cars are moving in
 the dehumidifier
 neon sign
 Cadillac dealer neon sign
 Cadillac Ad collection
 Cadillac Ad collection